The first area to be painted was the master bedroom and closets. In the end this was decidedly a Bad Move (tm). The painting in total took longer than expected because we lost a day in the middle.
As a result the flooring was delivered to the living area before that area was painted, requiring me to shift 72 boxes of laminate flooring across the room to get it done.
So in retrospect, had I painted the living area first things would have been a lot easier overall. Live and Learn I guess.
This shot shows the cutting in the master bedroom before I started to roll it out.